9:30 AM - 9:45 AM
[3H01] Evaluation of RCIC operation condition under beyond design basis by experiment and analysis
(1) Overall plan
Keywords:RCIC, Light Water Reactor, safety enhancement, Beyond design basis, Operating condition
It is estimated that Reactor Core Isolation Cooling system (RCIC) has been operated for about 66 hours at Fukushima Daiichi unit 2 though the design duration is 12 hours. It is useful to understand RCIC behavior under beyond design basis conditions. An overall plan of this project will be presented.