2019 Annual Meeting

Presentation information

Oral presentation

III. Fission Energy Engineering » 303-1 Reactor Instrumentation, Instrumentation System, Reactor Control/303-2 Remote Control, Robotics, Image Processing

[3K01-04] Wireless System and Underwater Robot

Fri. Mar 22, 2019 9:45 AM - 10:50 AM Room K (Common Education Bildg. 2 3F No.33)

Chair:Akio Gofuku(Okayama Univ.)

10:00 AM - 10:15 AM

[3K02] Wireless System with Controlling Electromagnetic Wave Distribution in Nuclear Power Plant

(VII)Proposal of check support system to prevent leakage of information by carrying out information terminal

*TAKAHIRO SHIROTA1, HIDEHIKO KURODA1, NAOTAKA ODA1, TAKESHI HASEGAWA1, YOSHIRO IKEDA1, TAKESHI ARAKAWA1, ISAO OHBA1 (1. Toshiba Energy Systems & Solutions Corporation)

Keywords:Wireless communications , Information terminal, Check support system

In recent years, the check support system using an information terminal has spread in the thermal power plant etc., and check by an information terminal is effective also in the viewpoint of a check time crunch to a nuclear power plant. Wireless communications are solvable by the communication security technology and the electric wave distribution control technique which our company announced, although we are anxious about a leak of information. However, when carried outside a controlled area, a leak of information may generate an information terminal. So, by this research, while carrying out wireless transfer of the data of an information terminal to an information server, it proposes about the check support system which also prevents the leak of information by carrying out of an information terminal, and reports a test result.