2020 Fall Meeting

Presentation information

Oral presentation

IV. Nuclear Plant Technologies » 403-1 Risk Assessment Technology, Application of Risk Information

[1L07-14] Flood PRA

Wed. Sep 16, 2020 2:45 PM - 5:00 PM Room L (Zoom room 12)

Chair:katsumi ebisawa(CRIEPI)

3:15 PM - 3:30 PM

[1L09] Construction of the technical basis for tsunami PRA

Part 8 : Proposal of evaluation method of the leakage flow through the building wall induced by tsunami wave pressure

*Hideki Kaida1, Masafumi Matsuyama1, Yoshiaki Watanuki1, Yoshinori Mihara2, Takafumi Hiraki3, Atsushi Onoouchi3 (1. CRIEPI, 2. Kajima Corp, 3. Chubu Electric Power Co., Inc.)

Keywords:Tsunami PRA, Fragility Evaluation, Tsunami pressure, Leakage flow

In the tsunami PRA, especially for the nuclear power plant whose tsunami risk is high, it is possible that partial damage of the building wall due to tsunami wave pressure which would lead to the tsunami inundation into the building. In order to consider above effects on the realistic indoor inundation analysis, we have proposed evaluation method of the leakage flow through the building wall induced by inundated tsunami wave pressure.