[2G06] Construction of the technical basis for tsunami PRA
Part16: Tsunami Level 2 PRA for Actual Nuclear Power Plant (3)Source Term Evaluation
Keywords:Tsunami PRA, External Event, Level 2 PRA, Source Term Evaluation, MAAP
This study aims a construction of the technical basis for comprehensive Tsunami PRA from Level 1 PRA to Level 2 PRA through a development for evaluation technique and model by model plant evaluation. In the part 16, the point estimation evaluation of the source term using MAAP in the Level 2 PRA for the actual nuclear power plant will be reported.