4:05 PM - 4:20 PM
[2F15] A study on analysis of actual date in “FUGEN” decommissioning
Dismantling of nuclear reactor peripheral equipment
Keywords:FUGEN, Man power, Waste volume, Reactor Peripheral Equipment
Project management data (number of man-hours, amount of waste, etc.) collected from the dismantling and removal of nuclear reactor peripheral equipment carried out in Fugen is classified and organized by type of equipment, and compared with actual data from JPDR dismantling work, etc. will be analyzed, and the results summarized as a unit work coefficient (number of man-hours required per unit weight (person-hour/ton)) for use in decommissioning cost evaluation, etc. will be reported.