9:45 AM - 10:00 AM
[2A02] A Study for the optimization of the decommissioning project of nuclear facilities
(5) Assessment of dismantlement cost performance evaluation
Keywords:Nuclear facilities, Decommissioning, Optimization, Dismantling cost, Activity level
In order to develop optimal decommissioning strategies, evaluation studies have been conducted using total cost as an indicator. Among these, dismantling cost evaluation is one of the most important items. Since 2008, the ATR Fugen has dismantled various facilities with different radioactivity levels, and the analysis of this experience can contribute to a more realistic scenario evaluation.
Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.