The 56th Annual Meeting of the Japan National Conference on Geotechnical Engineering

Presentation information

一般セッション

6.地盤と構造物

トンネル

Mon. Jul 12, 2021 9:00 AM - 10:30 AM 第7 (Zoom)

座長:大前 慶恵(大林組)

[12-7-1-08] Verification analysis model of push-over analysis for cut and cover tunnels

*Taku Kanzawa1, Kimitoshi Sakai1, Yuto Aso2, Shinji Konishi2 (1. Railway Technical Research Institute, 2. Tokyo Metro Co., Ltd)

Keywords:cut and cover tunnel, shear test, plasticity

Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.

Password