The 56th Annual Meeting of the Japan National Conference on Geotechnical Engineering

Presentation information

一般セッション

6.地盤と構造物

杭基礎⑦

Tue. Jul 13, 2021 2:45 PM - 4:15 PM 第8 (Zoom)

座長:磯部 公一(北海道大学大学院)

[13-8-4-08] A Case of Existing Pile Removal and Backfill Using Cement and Bentonite Water
–Spiral auger and air blow mixing method-

*ZHANG YUAN1, Yasushi Furugaichi1, Kenjiro Kawasaki1 (1. Tokyu Construction)

Keywords:Existing Pile , removal, backfilling

Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.

Password