[I-344] The report of trial construction in bridge slabs regarding the replaced slabs using the Cotter-joint method. (Part-2) [The results of the monitoring after the commencing operation.]
Keywords:Cotter slab, Monitoring
We have done of the trial construction and reported the verification of the constructability and the result of the productivity’s investigation in the Part-1 related to the said construction. We are going to schedule the monitoring during two years, after the commencing operation in the said trial construction. And it has already past one year and half. We report the outline of this monitoring and the measuring results from the commencement to the present, as the followings.