Japan Society of Civil Engineers 2019 Annual Meeting

Presentation information

第V部門

特殊舗装

Wed. Sep 4, 2019 10:25 AM - 11:55 AM V-3 (幸町北5号館 523講義室)

座長:藪 雅行(国立研究開発法人土木研究所)

[V-285] Applicability study aiming at shortening construction time of the mixture for thick layer asphalt pavement

*髙木 良久1、計良 和久1、竹林 宏樹1、中村 和博1、杉江 慶彦2 (1. 西日本高速道路、2. 昭建)

Keywords:mixture for thick layer asphalt pavement, modified asphalt, forced cooling, shortening construction time, initial rutting, test pavement

Pavement repair is carried out by thick layer asphalt pavement for pavement damage that occurred on SHIN-MEISHIN EXPRESSWAY managed by West Nippon Expressway Company.Pavement repair by thick layer asphalt pavement required long-term traffic control, so it was a problem that long traffic jam occurred.In order to solve this problem, the text reports the results of applicability study aiming at shortening construction time of the mixture for thick layer asphalt pavement that enables repair by daily traffic control.

Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.

Password