Japan Society of Civil Engineers 2019 Annual Meeting

Presentation information

第VI部門

鉄道 (8)

Thu. Sep 5, 2019 10:25 AM - 11:55 AM VI-3 (幸町北8号館 821講義室)

座長:伊藤 壱記(鉄道総合技術研究所)

[VI-857] New platforms construction using "Overhang Sidewalk"

*原 禎幸1、沼館 克哉1、西本 譲視1 (1. 三軌建設(株))

Keywords:platform, Overhang Sidewalk, Z-shaped Retaining Wall, Precast platform, Space under the platform, temporary earth retaining works are unnecessary

A new platform was built using "Overhang Sidewalk" which is used as a structure for sidewalk. Conventionally,"Z-shaped Retaining Wall" has been used to secure a space to escape when a passenger falls from a platform.Compared with this,the excavation position was far from the track,and the excavation depth was shallow,so that the temporary earth retaining works became unnecessary.As a result of the construction,it was able to be constructed safely,in a short construction period,and at a low cost without any track deformation.

Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.

Password