Japan Society of Civil Engineers 2023 Annual Meeting

Presentation information

第I部門

橋梁床版 (3)

Fri. Sep 15, 2023 4:50 PM - 6:10 PM I-2 (広島大 東広島キャンパス総合科学部講義棟 K106)

Chair: Keigo Kubo

5:30 PM - 5:40 PM

[I-257] Development of Steel-Concrete Composite Floor Slabs Using Finished Bolts as shear connector (Part 2)

*Kento Noguchi1, Tatsuki Takahashi1 (1. SHO-BOND CORPORATION)

Keywords:steel-concrete composite floor slab, shear connector, finished bolt, joint between panels, wheel load running test

Please log in with your participant account.
» Participant Log In