1:00 PM - 1:10 PM
[VI-200] Report on an elemental experiment for measures to prevent ground collapse when cutting rectangular steel segments of the Harmonica Tunnel Construction Method (1)
Keywords:Large section split shield tunnel construction method , slide steel plate, earth retaining between boxes, blade cutter, Water stop between boxes, box pipe jacking method
Please log in with your participant account.
» Participant Log In