10:00 AM - 10:10 AM
[VI-295] Analysis and verification of evacuation connection tunnel section width in the large section tunnel with poor geological conditions
Keywords:tunnel, simultaneous excavation of upper and lower lines, evacuation connection tunnel, 3D FEM analysis
Please log in with your participant account.
» Participant Log In