10:15 AM - 10:30 AM
[3B03] Internal Fire PSA of ABWR
Keywords:Internal Fire PSA, UK ABWR, NUREG/CR-6850, ASME/ANS RA-Sb-2013, Level 1 PSA, Level 2 PSA, Risk-informed improvements
Hitachi-GE developed Internal Fire PSA model for UK ABWR generic design based on NUREG/CR-6850 method. This presentation introduces the Internal Fire At Power PSA in terms of the methodology, peer review, results and risk-informed improvements.