[3B08] Dynamic Risk Analysis on Multi-hazards of Seismic and Seismic-induced Internal Flooding in Nuclear Installation

*SUNGHYON JANG1, AKIRA YAMAGUCHI1 (1. The University of Tokyo)

Keywords:Multi-hazard, Seismic-induced internal flooding, Dynamic Risk Assessment

Risk assessment for multi-hazard events at nuclear facilities is important. In this study, the probability of core damage caused by earthquake and seismic-induced internal flooding in turbine building of nuclear power plant was evaluated by using a dynamic risk assessment methodology.