2018 Annual Meeting

Presentation information

Oral presentation

III. Fission Energy Engineering » 305-2 Operational Management, Inspection and Maintenance of Reactor

[3K01-03] Application of Wireless Technology and Operation Management

Wed. Mar 28, 2018 10:05 AM - 10:55 AM Room K (U3-311 -U3 Building)

Chair: Atsushi Fushimi (Hitachi)

10:35 AM - 10:50 AM

[3K03] IC was no operation between earthquake and tunami in F1 No.1 Reactor(2)

Observation of IC-operation record at Turuga-Daiichi Atomic Power Plant

*Kiyoshi Yoneyama1 (1. H.O.Yoneyama)

Keywords:isolation condenser, F1 No.1 Reactor, operation manual at accident, Turuga-Daiichi Atomic Power Plant

The so-called IC operations between earthquake and tsunami on 3.11 are clearly denied by Yoneyama and Watanabe at Atomic Energy Society of Japan.
The genuine model of IC operation would be intoroduced with the Tsuruga emergency chart twice. The essence is shown by the difference of heat abosorption cycle by apparent and latent.