11:15 AM - 11:30 AM
[2D07] Development of Probabilistic Risk Assessment Methods for multiple tanks and multiple events at the Rokkasho Reprocessing Plant
(1)Policy and Plan
Keywords:Probabilistic Risk Assessment, Multiple units, Multiple events, Reprocessing Plant
In a reprocessing plant, safety system equipments are shared among multiple tanks in the event of a loss of cooling function. In addition, there are safety systemfacilities that combine the cooling function and the hydrogen scavenging function. Therefore, there is a possibility of simultaneous occurrence of severe accidents in multiple tanks and of different severe accidents. It is necessary to develop a method that can accurately evaluate the frequency of simultaneous occurrence of multiple tanks and multiple events in order to identify vulnerable points of equipment and operations related to severe accidents by utilizing risk assessment.
This paper, we report on the policy and plan for developing evaluation methods.
This paper, we report on the policy and plan for developing evaluation methods.
Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.