2024 Annual Meeting

Presentation information

Oral presentation

IV. Nuclear Plant Technologies » 403-1 Risk Assessment Technology, Application of Risk Information

[2D01-08] PRA Method 2

Wed. Mar 27, 2024 9:45 AM - 11:55 AM Room D (21Bildg.3F 21-312)

Chair:Seung hyun Jang(Hokkaido Univ.)

11:15 AM - 11:30 AM

[2D07] Development of Probabilistic Risk Assessment Methods for multiple tanks and multiple events at the Rokkasho Reprocessing Plant

(1)Policy and Plan

*Kazumi Takebe1, Masahiro Yamamoto1,4, Takashi Kodama1, Futoshi Tanaka2, Asei Kawasaki3, Isao Hongo2, Makoto Takahashi4 (1. JNFL, 2. MHI, 3. MHI NSE, 4. Tohoku Univ.)

Keywords:Probabilistic Risk Assessment, Multiple units, Multiple events, Reprocessing Plant

In a reprocessing plant, safety system equipments are shared among multiple tanks in the event of a loss of cooling function. In addition, there are safety systemfacilities that combine the cooling function and the hydrogen scavenging function. Therefore, there is a possibility of simultaneous occurrence of severe accidents in multiple tanks and of different severe accidents. It is necessary to develop a method that can accurately evaluate the frequency of simultaneous occurrence of multiple tanks and multiple events in order to identify vulnerable points of equipment and operations related to severe accidents by utilizing risk assessment.
This paper, we report on the policy and plan for developing evaluation methods.

Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.

Password