Hakodate Conv. of JPI (51st Petroleum-Petrochemical Symposium of JPI)

Session information

Refining equipment

[1D05-08] Refining equipment(3)

Thu. Nov 11, 2021 10:45 AM - 11:45 AM Room-D (Dojo-C/Hakodate Areana)

Chair:Masahiro Hirako(Idemitsu Kosan Co., Ltd.)

10:45 AM - 11:00 AM

○ryoke kiyoto1 (1. TOA OIL)

Most of the condition monitoring of rotating machines relies on the operator's patrol inspection.However, it is difficult to maintain and manage the rotating machine only by monitoring the condition by patrol inspection, and quantitative tendency management is not possible even when the machine staff judges the situation.Quantitative judgment can be made by installing sensors and constantly monitoring the status, and it is thought that failure prediction will be possible by accumulating monitoring data.

11:15 AM - 11:30 AM

○Terumasa Sagawa1 (1. TOSHIBA MITSUBISHI-ELECTRIC INDUSYRIAL SYSTEMS Corp.,)

1.大容量リチウムイオン二次電池システム、用途、ピークカット/ピークシフト、太陽光発電や発電装置との組み合わせ等。特徴、容量は並列システムにより最大出力20MWまでの充放電をサポート。業界最高レベルの高効率PCSを採用。2.高圧瞬低補償システム、用途、落雷等により発生する瞬停、停電対策を高圧・大容量・高効率で実現。特徴、高速解列スイッチの採用で、最速の切換時間1msecを達成。容量も最大12MVAまで対応。

11:30 AM - 11:45 AM

○Kazunori Kawano1, Hideyasu Shimizu1 (1. Seibu Oil Co. Ltd.)

当社の受電設備は設置後、約40年以上が経過し高経年化が進んでいた。2018年から2020年にかけて受電設備の更新工事を実施した。主要な更新対象機器は、110kV特高開閉所、110kVOFケーブル(2回線)、受電変圧器(110/11kV 35MVA✕2台)などから構成される。ケーブル埋設区間は約1.5kmにわたり、大規模な土木工事を伴った。工事期間中の装置運転継続、SDM工事での切替停電時の保安電力確保などを念頭に置いた工法の選定や工事計画の立案などについて紹介する。
×