[VI-365] About the bridge crane in precast segment production facilities
Keywords:Precast segment, Bridge crane, Change of driving direction , Assembly method
Shikoku crossing Expressway Yoshinogawaohashi (tentative name) is a long 1696.5 meters 15 spans continuous PC box girder bridge built in the mouth of Yoshinogawa river. The construction of upper part of bridge is a method of overhangingly erecting bridge using the pre-cast segment (I assume it a segment as follows) to plan securing of process and environmental load reduction. I report measures and the results that I carried out to cancel the limitation condition of the yard about use from the assembling of the bridge crane in the segment production yard in this report.
Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.