Tue. Sep 3, 2019 2:55 PM - 4:25 PM VI-8 (幸町総合教育棟 第22講義室)

座長:利波 宗典(大成建設)

[VI-365] About the bridge crane in precast segment production facilities

*横山 由宏1 (1. 鹿島建設㈱)

Keywords:Precast segment, Bridge crane, Change of driving direction , Assembly method

Shikoku crossing Expressway Yoshinogawaohashi (tentative name) is a long 1696.5 meters 15 spans continuous PC box girder bridge built in the mouth of Yoshinogawa river. The construction of upper part of bridge is a method of overhangingly erecting bridge using the pre-cast segment (I assume it a segment as follows) to plan securing of process and environmental load reduction. I report measures and the results that I carried out to cancel the limitation condition of the yard about use from the assembling of the bridge crane in the segment production yard in this report.