[22-5-1-05] Study on Bond Reduction Efficiency of Cutter Bid and Mudstone Ground for Shield Tunnel Construction
Keywords:Shield Tunnel, Bond Reduction, Direct Shear Test
Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.