JCI Annual Convention 2025 in Morioka

Presentation information

The 47th JCI Technical Conference

A. Material & Construction » High‐strength concrete (material)/Mass concrete

High‐strength concrete (material)/Mass concrete

Thu. Jul 17, 2025 9:00 AM - 10:30 AM Room 4 (アイーナ8階 811)

座長:小山智幸(建築),溝渕利明(土木)

[1185] NUMERICAL SIMULATION OF THERMAL CRACKING IN LONG RC WALLS OF SEWAGE TREATMENT PLANT

Adnan AKMAL1, Akira HOSODA1, T. Ngoc PHAN2, Yoshihiro KOUJI3 (1.Yokohama National University 2.University of Technology and Education, The University of Danang 3.Katsui Construction Co., Ltd.)

Keywords:Long RC walls、 base-restrained RC wall、 sewage treatment plant、 thermal cracking、 FEM thermal analysis、 crack equivalent strain method

This study examines a sewage treatment plant that exhibited many thermal cracks in its walls, resulting in costly repairs. The peripheral wall has the L/H ratio of 17.3, which is quite large compared to the wall-type structures externally restrained in general. Despite the use of a large reinforcement ratio of 0.83% and good construction practices, crack widths up to 0.35mm were observed. The Crack Equivalent Strain module of JCMAC3 is adopted to simulate this behavior. The temperature and cracking analysis results are compared with the actual temperature record, crack width and crack pattern.